Steel Producer Converts Waste Gas to Steam – Barge Shipped D-Boiler

Posted by on December 2, 2014 in Projects | 0 comments

Steel Producer Converts Waste Gas to Steam – Barge Shipped D-Boiler

Barge Shipped DA global steel producer awarded Indeck Keystone Energy a contract for the supply of a Blast Furnace Gas fired boiler and auxilaries as part of a project to convert waste by-product gases into electricity at a steel plant in the United States . The boiler design is a shop assembled “D” Type package boiler rated at 350,000 PPH / 1300 PSIG. Indeck managed the logistical move of the shop assembled boiler weighing 1 million pounds. The construction and transportation strategy used by Indeck minimized installation costs and schedule. The boiler and auxiliary equipment were delivered and were successfully started up.