Coal Fired Boiler For Heating Plant

Posted by on December 3, 2014 in Projects | 0 comments

Coal Fired Boiler For Heating Plant

Indeck Keystone Energy was awarded a contract for the supply of an 80,000 PPH / 750 PSIG stoker fired coal boiler with auxiliary equipment for field erection. The system is installed at a university heating plant as part of an emissions compliance upgrade replacing boilers from the 1950’s. The boiler surpassed all performance and emission goals. The boiler and auxiliary equipment have been delivered and started up successfully.

Click to enlarge     Click to enlarge     Click to enlarge